Clifton Rocks Railway Restoration
August 2005
Cleaning all the plants from the bottom station
I found a gas light in the chamber (looking very sorry for itself)
light now firmed up and cleaned. It has controls for gas and air and is a
regenerative gas light. All the controls open and shut the brass valves inside.
The two steel chimneys, gas pipe and internal supports were all replaced
Tom refurbishing the bracket
Maggie, Dave and Mike refitting the light bracket in its original place
Maggie with a big satisfied smile on putting the lamp back on its
original bracket after perhaps 70 years at least
Bushes on top of passageway by top reservoir
All cleaned off. Tank is by side of passageway