Clifton Rocks Railway Restoration
October 2006
Weekly progress diary from beginning of March 2005
Tom and Steff refitted drainage ledges for canvas stretched over refuge area (there is a drainage pipe at the bottom of each area)
buckets of rubble on top floor of bottom station (see July 06 pictures).
London Brick Company bricks used for all war-time structures.
The 2 Crossley gas engines used to be up here to pump the water back upto the top water tank.
Don't know why there was so much rubble up here unless it was the base
for the engines.
Tom and Steff enjoying a rest
its a big room with the rubble cleared. Note the original Victorian toilets were in the corner.